Pool Openings
Our Pool Opening Process:
- Removal and folding of the cover
- Removal of all plugs and gizmos (skimmer blowout tubes) from pool;
- Installation of skimmer baskets, gauges, etc.
- Re-installation of directional fittings, hydrotherapy fittings (if applicable). and circulation jets (if applicable);
- Ladders and handrails re-installed;
- Filter system re-assembly, system startup, and leak inspection;
- Heater start-up and ignition test (if applicable);
- Water treated with shock and algaecide
- Timer pins added
- SALT SYSTEMS: Our technicians will leave salt systems OFF because there is no way to know if there is enough salt in the pool at the time of opening, or if because the temperatures are too cold.
*POOL CLEANINGS: Pool Cleanings and vacuuming are NOT included in the Pool Opening Service but can easily be scheduled *